Information sheet 80

Our constructions > Water Intakes & Outlets

 

Water intake for the Cycofos power generating stationWater intake for the Cycofos power generating station

Design, study and construction for Alstom of 2 water intakes for electrical power generating stations at Fos sur Mer

These construction operations required the adjustment of the ocean bottom, the assembly and ballasting of the 2000 and 2200 mm diameters pipes, and the on-site transfer and submersion of the piping and the construction of the protective shields.

Total Amount: Nearly € 6 M

Client: Alstom

Project Manager: GDF-SUEZ