The work performed between September and October 2006 consisted of the construction and submersion of 18 50 ton pyramid-shaped concrete reefs and the submersion of 51 pre-fabricated reinforced concrete pipes in the Gulf of Aigues-Mortes.

The pieces were installed using our Kinard floating crane, equipped with a 130 ton crane.

The pieces were positioned by means of a GPS device.